+90 (216) 511 59 58
info@roktr.com
  • flagEN
    • flagTR
    • flagEN
logo
  • Home
  • Company
    • About Us
    • Quality Policy
    • Career
    • Certification
    • History
  • Services
  • Projects
  • Blog
  • Contact

Available at Operating Hours

Operating Hours

Write To Us

REQUEST A QUOTE

26

Oct 2016

Solar Power Plants

Blog Admin

ROK successfully received the official provisional acceptance certificates for 1MW Solar Power Plant Project at ER-SAN Manufacturing Plant in Kazan/Turkey and 0.62 MW Solar Power Plant at ER-SAN Milk Production Facility in Alpu /Turkey.  It is calculated that the solar generation plant/s shall generate 1.400.000 kWh energy per mW per year. Contracts were turnkey basis EPC contracts.


Latest News

15.05.2024
HV Mobile Capacitor Banks

The 132 kV Mobile Capacitor Banks have been successfully commissioned. Since these facilities are...

22.12.2023
FACTORY ACCEPTANCE TEST

Factory acceptance tests were completed successfully for the control, protection, communication, m...

10.01.2023
THE PROJECT IN GEORGIA

The contract for the engineering, supply, installation and testing and commissioning of protection...

28.10.2022
MOBILE HV CAPACITOR BANK PROJECT

The contract for 132 kV 2x30 MVAR Mobile Capacitor Bank was signed between Mass Energy Global Hold...

23.09.2021
Provisional Acceptance Certificate for the 400/132 kV Substation

On September 2020, ROK successfully received provisional acceptance certificate for the 400/132 kV...

ABOUT US



ROK Energy is an international technology, engineering, procurement and construction company serving global power generation, transmission and distribution sector.

CONTACTS



  • Küçükbakkalköy Mh. Sıraevler Sk. ROK Plaza No:14 Ataşehir İstanbul/Türkiye
  • info@roktr.com
  • +90 (216) 511 59 58

INFORMATION



  • Home
  • About Us
  • Certification
  • Career
  • History
  • Services
  • Projects
  • Blog
  • Contact
ALL RIGHT RESERVED | ROK ENERGY | Editör Medya